Sell and Parker Equipment

have pre-fabricated panel bridging systems that are easy to transport and install.

Fully galvanised and 7.3m wide between kerbs, they have a maximum load capacity of 70 tonne and are able to be deployed by launching or by simply craning the bridge structure into place.

The MBK Bridging solution can be installed in just a few days and is the perfect solution for sale or rental when a permanent, emergency, or temporary bridge solution is required.


can be tailored to your individual requirements including transport and construction. We can deliver and install to farms, mine or construction sites;

  • Galvanised steel.
  • Dual Lane - 7.3meters between Kerbs.
  • 70 Tonne Rated: Spans from 15m to 50m.
  • Roller Launch or Crane into Position.
  • Available on demand with Construction within three days.
  • Rent or Buy solutions available.
  • Packages include transport and construction.

Sydney Dragway
Ferrers Road, Eastern Creek

14 & 15 May 2014